Ivory clapboard home with paired black shutters, brick entry steps and a broad autumn lawn beneath an orange-leaved sugar maple.

Reaching Village Square in West Windsor During the Clarksville Road Closure

"Something needs to be done to get that bridge somehow re-opened…. We are in trouble." Tim Steenstrup, owner of The Little Gym of West Windsor, said this to the West Windsor Township Council on January 15, 2026. At that point the Clarksville Road Bridge had been closed for about ten weeks, and he said his gym had lost 30 to 35 percent of its members.

Nine months later, The Little Gym's website shows a September 2026 class calendar and a membership offer that runs October 1 through 31. The bridge is still closed. The gym is still at 217 Clarksville Road and still running classes. Several other Village Square tenants have posted recent signs of being open too.

The bridge closed one approach to the shopping center. The road to it stayed open. The owners who spoke to council in January blamed their lost business on the extra driving time from the detour. So this fall, the shops' biggest problem is distance, and distance is something customers can still work around.

What actually closed on November 2

NJDOT ordered the emergency closure of the bridge, County Route 638 over the Amtrak Northeast Corridor, on November 2, 2025. A routine inspection had found severe structural corrosion. The bridge carried about 15,000 vehicles a day between neighborhoods, businesses, and the Princeton Junction train station.

The township's local-access notice for Village Square spells out the rule. Clarksville Road is open for local business access from North Post Road up to the bridge closure, with no through traffic. If you're coming from the North Post Road end, the trip to Village Square works the way it always has.

Drivers from the other side lost their route. The West Windsor Voice reported that the closure blocks anyone coming from Quakerbridge Road and Meadow Road from reaching Village Square on Clarksville Road. Those are the customers the owners were talking about in January.

The way around, turn by turn

TAPinto published the county's detour when the bridge closed. The township's closure page links the official detour maps. From the Quakerbridge Road side, the published route to the open stretch of Clarksville Road goes like this:

  1. Take Quakerbridge Road north.
  2. Turn right onto Route 1 north.
  3. Turn right onto Alexander Road.
  4. Follow Alexander Road southeast to North Post Road and Clarksville Road.

This route was published in November 2025. The township's map is the best place to check whether any turn has changed since then. The Voice also named Village Road and Route 1 as the main alternates drivers have been using since the closure.

The detour runs along Alexander Road, which matters on Saturday mornings. The West Windsor Community Farmers' Market's entrance is at 877 Alexander Road, in the Princeton Junction station's Vaughn lot. The market runs Saturdays from 9 a.m. to 1 p.m. through November 21. Community News reported that the market moved to a larger location for 2026 and draws more than 60 farms, producers, and purveyors each week. If you're already making the drive around, you can do the market and Village Square on one trip.

Who is behind the "Open" signs

The township's December 2025 access flyer lists the tenants at 217 Clarksville Road. Since then, a few have posted something online that shows they're operating this summer and fall. The table pairs each business with the most recent sign of activity the research found.

Business What it is Most recent sign of activity
The Little Gym Kids gymnastics September 2026 class calendar; offer valid October 1 to 31
Capuano Ristorante Pizza and Italian Online ordering and menu pages updated in August 2026
Hot Wok Cafe Chinese Online ordering page set for pickup starting October 4 at 11 a.m.
Mizu Japanese Cuisine Japanese Pickup ordering available through a delivery app
That Pottery Place Craft studio Walk-in pottery painting; wheel lessons and parties booked online
Salon Facci Salon and spa Tuesday through Saturday hours posted on its site

The flyer also lists Gateway of India, an Indian grocery; Global Halal Meat; Vsmile Dental; NJ TaeKwonDo Kickboxing; Windsor Happy School; Youngs Cleaners; and Kumon. Several of these owners or their representatives spoke at the January council meeting. The research did not turn up a fall 2026 update from them, so call before you go.

The same open stretch of road leads to the businesses just past the shopping center. At 231 Clarksville Road the flyer lists Einstein Lab, Giocoso Strings Program, Westrick Music Academy, and Russian School of Math. Around the corner on Everett Drive are Ludus Performance Gym, Stibol Music, Forge Personal Training, ALOHA Mind Math, and Princeton Academy of Martial Arts. Weekday lessons, practices, and classes at these addresses all depend on that one open approach.

How the town has tried to bring customers back

The first help was small and local. Mayor Hemant Marathe said the tax assessor was giving Clark Plaza LLC, which owns the Village Square property, tax credits it could pass on to its tenants. The township also shared Small Business Administration grant information and suspended its sign restrictions so the shops could advertise that they were open.

On March 27, four Village Square restaurants held a fundraiser for the Send Hunger Packing program for WW-P students in need: Capuano Ristorante, Mizu Sushi, New Hot Wok, and Global Grill & Halal Meat. The Patch event listing said 5 percent of participating sales would be donated. At the April 13 meeting, council members reported meeting with county business advocates and the center's owners.

By June 8, a council member reported that State Senator Shirley Turner had introduced legislation for financial help to retail businesses affected by the closure. On August 7, Community News reported that Mercer County had awarded grants to local businesses hurt by the closure. The article did not name the recipients or the amounts.

Even so, the township described the damage in stronger terms this fall than in the winter. Resolution 2026-R199, adopted September 28, says Village Square merchants have reported revenue losses of more than 50 percent. In January, one owner reported losing a third of his members. By September, the township was citing losses of half of revenue. Tax credits, sign permission, and grants have helped, but they don't give back the trip customers lost.

Why October 10 matters for the bridge

The bridge is coming back in two stages. NJDOT approved and signed the final structural repair plans on May 22, after a fabrication crew started work on site May 18. The first stage is a temporary one-lane bridge with traffic signals at each end, while a permanent replacement is designed separately.

The work itself is slow because of what the bridge crosses. Work over Amtrak's high-voltage lines can only happen overnight and on weekends. It needs the overhead wires shut off, safety flaggers, and track outages that only Amtrak can grant. The township's September 18 update said Amtrak's Engineering and Planning Support group had issued a Letter of No Exception on the revised plans. The update also said this was not final approval, and that utility relocations and a lead abatement plan were still pending.

The next window is coming up soon. Amtrak and NJ Transit will reduce service from October 10 through November 16 for work on the Portal North Bridge. The township's September 30 letter to Governor Mikie Sherrill and the state's congressional delegation calls this a time-sensitive chance to get the track outages NJDOT needs. NJDOT is still aiming for the one-lane reopening before the end of 2026. That depends on Amtrak's approvals, so it is a target, not a confirmed date.

On October 2, the township posted a fillable letter template on its bridge update page. It asks residents to email the governor, Senators Cory Booker and Andy Kim, and Congresswoman Bonnie Watson Coleman, and to copy [email protected]. Until the bridge reopens, the North Post Road end of Clarksville Road is the open approach to every business listed above.

If the Clarksville Road closure has you rethinking a commute, a sale timeline, or a home search around Princeton Junction, Christina Winka is happy to go over what a one-lane reopening and a separate replacement project could mean for your plans. Let's Connect.

Personalized Service. Proven Local Expertise.

From your first consultation to closing day, Christina Winka Homes is committed to providing honest advice, responsive communication, and an experience tailored to your unique goals.

Follow Me on Instagram